Project Maps

Highway 71 (Stateline Avenue) from 7th Street to Arkansas Boulevard.

The Arkansas Department of Transportation (ARDOT) is proposing to reconstruct Highway 71 (State Line Avenue) from Highway 67 South (7th Street) to Arkansas Boulevard, and to reconstruct Hazel Boulevard from 7th Street to State Line Avenue.

Interstate 30 from Texas State Line to I-49 crossing.

The Arkansas Department of Transportation (ARDOT) is proposing to widen a four-mile section of Interstate 30 from the Texas state line to the Interstate 49 crossing. The proposed widening will increase the total number of 12-foot travel lines from four to six, with two 17-foot shoulders and a 2-foot wide concrete median wall.

Interstate 30 Bowie County Corridor.

This project consists of widening of I-30 from 0.6 mile west of FM 989 to the Arkansas State Line to improve mobility and enhance safety.

US 82 Texas Corridor Study.

The US 82 Corridor Study will examine currently planned transportation projects, analyze safety, connectivity, and mobility concerns, as well as identify short-, medium-, and long-term improvements to address the needs of the corridor. Findings and recommendations will assist in guiding the future of the corridor as it evolves.